Val-D'Or Mining Diamond Drill Program Update - Perestroika Prospect Val-D'Or, Quebec Eldorado Gold (Quebec) Inc. - 70% (VZZ) / 30% (ELD) JV

November 19, 2026

  • PE-26-042 INTERSECTS 2.92 g/t over 7.30 m (70.00 m to 77.30 m)
    • Including 5.95 g/t Au over 2.30 m (75.00 m – 77.30 m), and includes 11.90 g/t over 0.80 m (76.50 m to 77.30 m)
  • PE-26-044 INTERSECTS 14.11 g/t Au @ 7.50 m (91.50 m to 99.00 m)
    • Including 58.77 g/t Au over 1.70 m (91.50 m to 93.20 m) and includes 150.41 g/t Au over 0.60m (92.10 m to 92.70 m)
  • PE-26-045B INTERSECTS 3.15 g/t Au over 17.00 m (113.50 m to 130.50 m)
    • Including 7.30 g/t Au over 6.20 m (115.50 m to 121.70 m) and includes 11.91 g/t Au over 0.50 m (115.50 m to 116.00 m) and 51.31 g/t Au over 0.50 m (121.20 m to 121.70 m).

Val-D'Or, Québec- November 19, 2026 - Val-D'Or Mining Corporation (TSXV: VZZ) (OTCQB: VDOMF) ("the Company") is pleased to report on the receipt of additional analytical results from the winter 2026 diamond drilling program on the Perestroika Prospect. The property is in Courville Township, Québec, located approximately 40 kilometres northeast of Val-D'Or, Québec.

2026 Diamond Drill Program Update:

The 2026 diamond drilling program included 20 planned diamond drill holes totalling approximately 8,000 metres, utilizing two diamond drill rigs. Drilling activities were completed on April 6th and equipment demobilized from the property on April 9th. A total of twenty-five (25) NQ diamond drillholes were completed (PE-26-021 to PE-26-45), for a cumulative 12,477 metres drilled. 

The current mineralized footprint on the property shows a mineralized corridor 1,100 metres along strike by 150 metres wide, between two shear corridors. Drilling in 2026 was conducted over 1,600 metres along the northwest-southeast tending mineralized deformation corridor, testing for its strike extensions. 

Table I: Diamond Drillhole Information

Hole # Easting (NAD 83 Z18) Northing (NAD 83 Z18) Length (m) Azimuth Dip
PE-26-021 314495 5364639 405 50 -70
PE-26-022 314403 5364693 537 48 -70
PE-26-023 314653 5364686 498 300 -65
PE-26-024 314545 5364623 495 50 -65
PE-26-025 314629 5364569 459 50 -67
PE-26-026 314569 5364565 489 50 -67
PE-26-027 314790 5364459 666 50 -67
PE-26-028 314346 5364732 573 50 -67
PE-26-029 314075 5365348 480 205 -50
PE-26-030 314940 5364420 576 50 -65
PE-26-031 314012 5365381 525 210 -45
PE-26-032 314150 5365090 441 205 -50
PE-26-033 314897 5364535 552 315 -65
PE-26-034 314150 5365090 435 205 -65
PE-26-035 314990 5364617 429 205 -50
PE-26-036 314289 5364437 381 205 -50
PE-26-037 314990 5364617 471 205 -65
PE-26-038 314466 5364762 630 305 -50
PE-26-039 315000 5364340 42 50 -65
PE-26-039A 315000 5364340 507 50 -65
PE-26-040 314215 5364810 552 50 -67
PE-26-041 315225 5364500 495 205 -50
PE-26-042 314750 5364500 507 50 -67
PE-26-043 314697 5364478 363 50 -67
PE-26-044 314779 5364422 426 50 -67
PE-26-045 314871 5364407 54 50 -67
PE-26-045A 314871 5364407 24 50 -67
PE-26-045B 314871 5364407 462 50 -67

 

Note: PE-26-039A was abandoned due to hole deviation - unintended changes in azimuth (horizontal direction) and dip (inclination/vertical angle), azimuth; and PE-26-45 and PE-26-45A abandoned due to casing movement.

Map I: Diamond Drill Hole Plan – Assay Status

 

For comparative purposes, the 2025 diamond drill program consisted of twelve (12) NQ holes completed for a cumulative 5,004 metres drilled. In 2024, the diamond drill program consisted of eight (8) NQ holes drilled and extended two (2) previous holes (GPS-09-01 and GPS-09-02 – the Golden Valley Mines discovery holes) for a cumulative 4,470 metres drilled. The total metres drilled over the 3-year period from 2024 to 2026 is 21,951 metres in 45 drillholes, plus 2 drillhole extensions.

Eldorado Gold was the project operator. Core logging of the drillholes has been completed, and the initial analytical results received. At the of time these results were reported in this news release, 3,577 sample results remain pending from the laboratory.

For details of the 2026 Diamond Drill Program Outline and Objectives, the reader is referred to Val-D'Or Mining Corporation's February 19, 2026; March 30, 2026; May 5, 2026; and August 5, 2026, October 23, 2026 news releases.

Several additional gold-mineralized intersections have been recorded from additional analytical results issued by the project operator Eldorado Gold (Québec). These intersections from drillholes PE-26-042; PE-26-044; and PE-26-045B consist of multiple intervals of altered felsic dyke sections, hosting mineralized extensional and flat-lying (stacked) quartz-ankerite veins. Preliminary indications from the core logging suggest that the gold content is usually proportionate with sulphide content, that being pyrite, and local occurrences of visible gold.

Glenn Mullan (President/CEO) of Val-D'Or Mining stated that "The objective of these three (3) drillholes being drilled down-plunge, was to test the idea that the flat extensional gold-bearing quartz-ankerite veins are stacked in an alignment parallel to the stretching lineation, and to test for the presence of multiple shoots of high-density stacked veins. These additional results are highly encouraging, spanning a lateral strike length of over 1,100-metres intermittently along the southern portion of the presently defined, 1,600-metre NW-SE mineralized footprint, located between two shear corridors separated by 150-metres."

These three (3) drillholes are summarized below:

Selective Individual Diamond Drillhole Assay Intersection Highlights

PE-26-042: Objective – Drilled down plunge to intersect the extensional flat quartz-ankerite veins at a high-angle. The hole returned 8 assay intervals greater than 1 g/t Au from the top of the hole.

The best assay interval near surface intersected:

  • 4.10 m @ 1.91 g/t Au (57.00 m to 61.10 m), including a 0.50 m @ 6.19 g/t (60.50 m to 61.10 m). The mineralization is mostly associated with quartz-ankerite veins injected into a sericitized basalt. This mineralized interval is located at the upper contact with a felsic dyke.

PE-26-042: 4.10 m @ 1.91 g/t Au (57.00 m to 61.10 m) including a 0.50 m @ 6.19 g/t associated with quartz-ankerite veins injected in sericitized basalt and a felsic dyke.

 

Additional mineralized intervals were further intersected further down the hole:

  • The first interval returned: 7.30 m @ 2.92 g/t Au (70.00 m to 77.30m), including 2.30 m 5.95 g/t Au (75.00 m to 77.30 m), and includes 0.80 m @ 11.90 g/t (76.50 m to 77.30 m). Gold mineralization is associated with quartz-ankerite veins injected in a strong sericitized basalt and felsic dyke.

PE-26-042: 7.30 m @ 2.92 g/t Au (70.00 m to 77.30m), including 2.30 m @ 5.95 g/t Au (75.00 m to 77.30 m), and includes 0.80 m @ 11.90 g/t (76.50 m to 77.30 m) Au. The interval is associated with quartz-ankerite veins injected in a strong sericitized basalt and felsic dyke. The 0.80 m @ 4.66 g/t Au (70.00 m to 70.80 m) was previously reported.

 

  • The second Interval returned: 12.95 m @ 1.08 g/t Au (87.05 m to 100.00 m), including 0.65 m @ 4.07 g/t Au (87.05 m to 87.70 m) and 0.50 m @ 5.23 g/t Au (92.00 m to 92.50 m) associated with quartz-ankerite veins injected in a strong sericitized basalt and felsic dyke.

PE-26-042: 12.95 m @ 1.08 g/t Au (87.05 m to 100.00 m), including 0.65 m @ 4.07 g/t Au (87.05 m to 87.70 m) and 0.50 m @ 5.23 g/t Au (92.00 m to 92.50 m). The mineralized interval is associated with quartz-ankerite veins injected in a strong sericitized basalt and felsic dyke.

 

  • The third interval returned: 31.80 m @ 1.21 g/t Au (104.50 m to 136.30 m), including 0.55 m @ 14.54 g/t Au (105.90 m to 106.45 m), 0.75 m @ 4.56 g/t Au (131.35 m to 132.10 m) and 1.00 m @ 4.85 g/t Au (135.30 m to 136.30 m). The mineralized interval is associated with quartz-ankerite veins injected in a felsic dyke.

PE-26-042: 31.80 m @ 1.21 g/t Au (104.50 m to 136.30 m), including 0.55 m @ 14.54 g/t Au (105.90 m to 106.45 m); 0.75 m @ 4.56 g/t Au (131.35 m to 132.10 m) and 1.00 m @ 4.85 g/t Au (135.30 m to 136.30 m). The mineralized interval is associated with quartz-ankerite veins injected in a felsic dyke.

 

PE-26-044: Objective – Drilled down plunge to test the theory that the gold bearing quartz-ankerite veins are stacked in an alignment parallel to the stretching lineation, and test for the presence of multiple shoots of high density stacked veins.

The upper part of drillhole returned 10 assay values greater than 1 g/t Au. The best interval intersected 7.50 m @ 14.11 g/t Au (91.50 m to 99.00 m), including 1.70 m @ 58.77 g/t Au (91.50 m to 93.20 m), and includes 0.60 m @ 150.41 g/t Au (92.10 m to 92.70 m). The mineralization is associated with quartz-ankerite veins, containing 15% pyrite, injected at the contact of a felsic dyke and a strongly sericitized basalt.

Additionally, 1.60 m @ 3.01 g/t Au (97.40 m to 99.00 m), including 0.50 m @ 7.13 g/t Au (97.90 m to 98.40 m) was intersected. The interval is associated with quartz-ankerite veins injected in a felsic dyke.

PE-26-044: 7.50 m @ 14.11 g/t Au (91.50 m to 99.00 m), including 1.70 m @ 58.77 g/t Au (91.50 m to 93.20 m), which includes 0.60 m @ 150.41 g/t Au (92.10 m to 92.70 m). The mineralized interval is associated with quartz-ankerite veins, containing pyrite, injected at the contact of a felsic dyke and a strongly sericitized basalt. Additionally, 1.60 m @ 3.01 g/t Au (97.40 m to 99.00 m), including 0.50 m @ 7.13 g/t Au (97.90 m to 98.40 m). This mineralized interval is associated quartz-ankerite veins injected in a felsic dyke.

 

Further along the drillhole, 1.10 m @ 14.73 g/t Au (251.70 m to 252.80 m), including 0.60 m @ 22.75 g/t Au (252.20 m to 252.80 m) was intersected. The interval is associated with a quartz-ankerite veins injected in a strongly sericitized basalt.

PE-26-044: 1.10 m @ 14.73 g/t Au (251.70 m to 252.80 m), including 0.60 m @ 22.75 g/t Au (252.20 m to 252.80 m) associated with a quartz-ankerite veins injected in a strongly sericitized basalt. Visible gold was observed.

 

At 258.70 m to 259.80 m, an interval of 1.10 m @ 3.46 g/t Au, including 0.60 m @ 5.98 g/t Au (259.30 m to 259.80 m) was intersected. The interval is associated with a quartz-ankerite veins injected in sericitized basalt. Visible gold was observed.

PE-26-044: 1.10 m @ 3.46 g/t Au (258.70 m to 259.80 m), including 0.60 m @ 5.98 g/t Au (259.30 m to 259.80 m) associated with a quartz-ankerite veins injected in sericitized basalt.

 

PE-26-045B: Objective – Drilled down plunge to test the theory that the gold bearing quartz-ankerite veins are stacked in an alignment parallel to the stretching lineation, and test for the presence of multiple shoots of high density stacked veins.

Near surface, between 27.00 m and 28.50 m, 1.50 m @ 18.65 g/t Au, including 0.50 m @ 45.86 g/t Au (27.50 m to 28.00 m) associated with quartz-ankerite veins in a felsic dyke, was intersected. The vein returning 45.86 g/t Au contains abundant pyrite.

PE-26-045B: 1.50 m @ 18.65 g/t Au (27.00 m to 28.50 m), including 0.50 m @ 45.86 g/t Au (27.50 m to 28.00 m) associated with quartz-ankerite veins in a felsic dyke. The vein returning 45.86 g/t Au contains pyrite

 

2.50 m @ 7.25 g/t Au (57.00 m to 59.50 m), including 0.80 m @ 14.98 g/t Au (58.20 m to 59.00 m) associated with quartz-ankerite veins injected in basalt. Visible gold was observed at 58.35 m (see photo below).

PE-26-045B: 2.50 m @ 7.25 g/t Au (57.00 m to 59.50 m), including 0.80 m @ 14.98 g/t Au (58.20 m to 59.00 m) associated with quartz-ankerite veins injected in basalt. The vein carrying 14.98 g/t Au contains pyrite and visible gold was observed.

 



Further down the drillhole, an intersection of 17.00 m @ 3.15 g/t Au (113.50 m to 130.50 m), including 6.20 m @ 7.30 g/t Au (115.50 m to 121.70 m), which includes 0.50 m @ 11.91 g/t Au (115.50 m to 116.00 m) and 0.50 m @ 51.31 g/t Au (121.20 m to 121.70 m), was recorded. The mineralized interval is associated with quartz-ankerite veins injected in felsic dyke.

\

PE-26-045B: 17.00 m @ 3.15 g/t Au (113.50 m to 130.50 m), including 6.20 m @ 7.30 g/t Au (115.50 m to 121.70 m), which includes 0.50 m @ 11.91 g/t Au (115.50 m to 116.00 m) and 0.50 m @ 51.31 g/t Au (121.20 m to 121.70 m) associated with quartz-ankerite veins injected in felsic dyke.

 

2.20 m @ 2.72 g/t Au (145.00 m to 147.20 m), including 0.70 m @ 5.50 g/t Au (146.50 m to 147.20 m) associated with quartz-ankerite veins injected in basalt.

PE-26-045B: 2.20 m @ 2.72 g/t Au (145.00 m to 147.20 m), including 0.70 m @ 5.50 g/t Au (146.50 m to 147.20 m) associated with quartz-ankerite veins injected in basalt.

 

14.25 m @ 1.25 g/t Au (156.00 m to 170.25 m), including 0.50 m @ 13.84 g/t Au (156.00 m to 156.50 m). The mineralized interval is associated with quartz-ankerite veins injected in sericitized basalt.

PE-26-045B: 14.25 m @ 1.25 g/t Au (156.00 m to 170.25 m), including 0.50 m @ 13.84 g/t Au (156.00 m to 156.50 m). The mineralized interval is associated with quartz-ankerite veins injected in sericitized basalt.

 

0.50 m @ 10.01 g/t Au (248.50 m to 249.00 m) associated with quartz-ankerite veins injected in sericitized basalt. Visible gold was observed.

PE-26-045B: 0.50 m @ 10.01 g/t Au (248.50 m to 249.00 m) associated with quartz-ankerite veins injected in sericitized basalt. Visible gold was observed.

 



Table I: Significant Drill Hole Intersections

Hole-ID From (m) To (m) Length (m) Au (g/t) Zone/Comment
PE-26-042 41.95 42.50 0.55 6.29 Quartz-ankerite vein injected in sericitized basalt
PE-26-042 49.60 50.60 1.00 4.73 Quartz-ankerite vein injected in sericitized basalt
Including 50.10 50.60 0.50 8.93 Quartz-ankerite vein injected in sericitized basalt
PE-26-042 57.00 61.10 4.10 1.91 Quartz-ankerite vein injected in sericitized basalt and felsic dyke
Including 60.50 61.10 0.60 6.19 Quartz-ankerite vein injected in sericitized basalt
PE-26-042 67.20 67.75 0.55 1.53 Quartz-ankerite vein injected in sericitized basalt
PE-26-042 70.00 77.30 7.30 2.92 Quartz-ankerite vein injected in the altered basalt and felsic dyke. Interval overlapping the contact.
Including 70.00 71.30 1.30 3.97 Quartz-ankerite vein injected in sericitized basalt near a felsic dyke
And 70.00 70.80 0.80 4.66 Quartz-ankerite vein injected in sericitized basalt
Including 75.00 77.30 2.30 5.95 Quartz-ankerite vein injected in felsic dyke
Including 76.50 77.30 0.80 11.90 Quartz-ankerite vein injected in felsic dyke
PE-26-042 87.05 100.00 12.95 1.08 Quartz-ankerite vein injected in sericitized basalt and felsic dykes
Including 87.05 87.70 0.65 4.07 Quartz-ankerite vein injected in sericitized basalt
Including 92.00 92.50 0.50 5.23 Quartz-ankerite vein injected in sericitized basalt
PE-26-042 104.50 136.30 31.80 1.21 Quartz-ankerite vein injected in felsic dyke
Including 105.90 106.45 0.55 14.54 Quartz-ankerite vein injected in felsic dyke
Including 131.35 132.10 0.75 4.56 Quartz-ankerite vein injected in felsic dyke
Including 135.30 136.30 1.00 4.85 Quartz-ankerite vein injected in felsic dyke
PE-26-042 138.30 138.90 0.60 1.29 Quartz-ankerite vein injected in felsic dyke
PE-26-042 153.60 154.10 0.50 2.43 Quartz-ankerite vein injected in felsic dyke
PE-26-042 156.20 156.70 0.50 10.48 Quartz-ankerite vein injected in felsic dyke
PE-26-042 163.00 163.75 0.75 1.53 Quartz-ankerite vein injected in felsic dyke
PE-26-042 169.70 170.30 0.60 1.15 Quartz-ankerite vein injected in sericitized basalt
PE-26-042 171.40 172.00 0.60 1.91 Quartz-ankerite vein injected in felsic dyke
PE-26-042 173.80 174.30 0.50 15.66 Quartz-ankerite vein injected in felsic dyke
PE-26-042 174.30 175.00 0.70 1.56 Quartz-ankerite vein injected in felsic dyke
PE-26-042 182.40 183.00 0.60 1.05 Quartz-ankerite vein injected in felsic dyke
PE-26-042 188.80 189.30 0.50 2.48 Quartz-ankerite vein injected in sericitized basalt
PE-26-042 208.00 209.00 1.00 1.74 Quartz-ankerite vein injected in felsic dyke
PE-26-042 381.70 382.20 0.50 3.15 Quartz-ankerite vein injected in basalt
PE-26-044 80.30 80.80 0.50 1.85 Quartz-ankerite vein injected in sericitized basalt
PE-26-044 91.50 99.00 7.50 14.11 Quartz-ankerite vein injected in sericitized basalt and felsic dyke
Including 91.50 93.20 1.70 58.77 Quartz-ankerite vein injected in sericitized basalt near a felsic dyke
Including 92.10 92.70 0.60 150.41 Quartz-ankerite vein injected in basalt containing 15% pyrite
PE-26-044 103.30 103.80 0.50 1.91 Quartz-ankerite vein injected in chloritized basalt
PE-26-044 110.40 111.40 1.00 2.20 Quartz-ankerite vein injected in sericitized basalt
Including 110.40 110.90 0.50 3.84 Quartz-ankerite vein injected in sericitized basalt
PE-26-044 150.70 151.30 0.60 12.90 Quartz-ankerite vein injected in sericitized basalt
PE-26-044 157.00 157.50 0.50 1.20 Quartz-ankerite vein injected in sericitized basalt
PE-26-044 177.20 177.70 0.50 1.02 Quartz-ankerite vein injected in sericitized basalt
PE-26-044 200.90 201.60 0.70 2.29 Quartz-ankerite vein injected in sericitized basalt
PE-26-044 220.60 221.10 0.50 6.54 Quartz-ankerite vein injected in felsic dyke
PE-26-044 225.10 226.10 1.00 1.29 Quartz-ankerite vein injected in sericitized basalt
PE-26-044 251.70 252.20 0.50 5.11 Quartz-ankerite vein injected in sericitized basalt
PE-26-044 252.20 252.80 0.60 22.75 Quartz-ankerite vein injected in sericitized basalt
PE-26-044 258.70 259.30 0.60 1.36 Quartz-ankerite vein injected in sericitized basalt
PE-26-044 259.30 259.80 0.50 5.98 Quartz-ankerite vein injected in sericitized basalt
PE-26-044 286.10 286.60 0.50 1.25 Quartz-ankerite vein injected in sericitized basalt
PE-26-044 300.70 301.20 0.50 1.60 Quartz-ankerite vein injected in sericitized basalt
PE-26-044 311.50 312.10 0.60 2.53 Quartz-ankerite vein injected in sericitized basalt
PE-26-044 287.10 287.60 0.50 2.26 Quartz-ankerite vein injected in sericitized basalt
PE-26-045B 27.00 28.50 1.50 18.65 Quartz-ankerite vein injected in felsic dyke
Including 27.50 28.00 0.50 45.86 Quartz-ankerite vein injected in felsic dyke
PE-26-045B 28.00 28.50 0.50 4.38 Quartz-ankerite vein injected in sericitized basalt and felsic dyke
PE-26-045B 42.75 43.25 0.50 4.83 Quartz-ankerite vein injected in sericitized basalt
PE-26-045B 57.00 59.50 2.50 7.25 Quartz-ankerite vein injected in sericitized basalt
Including 58.20 59.00 0.80 14.98 Quartz-ankerite vein injected in sericitized basalt, 10% pyrite
PE-26-045B 70.50 71.00 0.50 1.13 Quartz-ankerite vein injected in sericitized basalt
PE-26-045B 74.45 75.10 0.65 2.15 Quartz-ankerite vein injected in sericitized basalt
PE-26-045B 80.00 80.50 0.50 2.71 Quartz-ankerite vein injected in sericitized basalt
PE-26-045B 93.00 104.00 11.00 0.80 Quartz-ankerite vein injected in sericitized basalt and felsic dyke
Including 93.00 93.80 0.80 4.54 Quartz-ankerite vein injected in sericitized basalt
Including 103.00 104.00 1.00 2.15 Quartz-ankerite vein injected in sericitized basalt
PE-26-045B 113.50 130.50 17.00 3.15 Quartz-ankerite vein injected in felsic dyke
Including 115.50 121.70 6.20 7.30 Quartz-ankerite vein injected in felsic dyke
PE-26-045B 131.00 133.60 2.60 2.39 Quartz-ankerite vein injected in felsic dyke
Including 131.00 132.00 1.00 3.33 Quartz-ankerite vein injected in felsic dyke
PE-26-045B 145.00 147.20 2.20 2.72 Quartz-ankerite vein injected in basalt
Including 146.50 147.20 0.70 5.50 Quartz-ankerite vein injected in basalt
PE-26-045B 153.20 153.70 0.50 1.81 Quartz-ankerite vein injected in basalt
PE-26-045B 156.00 170.25 14.25 1.25 Quartz-ankerite vein injected in sericitized basalt and felsic dykes
Including 156.00 156.50 0.50 13.84 Quartz-ankerite vein injected in sericitized basalt
Including 160.50 161.00 0.50 7.82 Quartz-ankerite vein injected in sericitized basalt
PE-26-045B 176.65 177.35 0.70 1.73 Quartz-ankerite vein injected in felsic dyke
PE-26-045B 189.35 189.85 0.50 1.46 Quartz-ankerite vein injected in basalt
PE-26-045B 213.40 214.00 0.60 1.12 Quartz-ankerite vein injected in felsic dyke
PE-26-045B 248.50 249.00 0.50 10.01 Quartz-ankerite vein injected in sericitized basalt

 

Note: The mineralized intersections reported in this disclosure represent apparent lengths drilled along the downhole length of the drillhole and do not necessarily represent the true widths of mineralization. The true width is the actual perpendicular thickness of the mineralized zone.

Property Exploration Summary and Highlights:

The Perestroika Prospect lies along a structural corridor of intense deformation and alteration within the WNW-ESE trending Uniacke Deformation Corridor, inferred as the southeastern strike extension of the prolific Destor-Porcupine Deformation Zone. Previous exploration work located on the Perestroika Prospect established the presence of a gold mineralized trend hosting two (2) historical surface showings, referred to as the "Uniacke Shear" and "Glasnost" gold occurrences. In 2009, drilling by Golden Valley Mines and Royalties Ltd. successfully intersected multiple zones of high-grade gold mineralization associated with these historical gold showings, including drill intersections of 1.15 metres averaging 59.52 g/t Au, including 0.30 metres grading 217 g/t Au in GPS09-01 and 3.50 metres averaging 18.08 g/t Au, including 3.05 metres averaging 20.69 g/t Au in GPS09-02 (GM 54860).

This Phase III diamond drilling program intended to follow-up on promising gold values from the 2009 Golden Valley Mines and Royalties Ltd. drill program results and the subsequent Eldorado operated drill programs in 2024 and 2025. For specific details on the regional property geology, program objectives and the highlighted gold assay intersections from the 2024 and 2025 drill programs, including drill hole location maps and table of assay highlights, the reader is referred to Val-D'Or Mining Corporation's December 19, 2024 (assays for holes PE-24-001 through to PE-24-008, GPS-09-01 EXT and GPS-09-02 EXT), and September 26, 2025 (assays for holes PE-25-10 and PE-25-012 through to PE-25-020) news releases.

The following three maps illustrate the 2024, 2025 and 2026 drilling highlights currently reported on the Perestroika Prospect for ease of reference.







Sampling, Analytical Methods and QA/QC Protocols:

Holes PE-26-021 to PE-26-025 were assayed at ALS Canada Ltd. Holes PE-26-026 to PE-26-030 were assayed at Bourlamaque Assay Laboratories Ltd. with sample preparation and gold analysis completed in Val-d'Or, Québec. Gold values were determined by 30g Py-SAA finish with over limits (>10g/t Au) by a 30g GRAV finish. Note that ICP data is pending and was sent to ALS Canada Ltd. for 48 Element Four-Acid ICP-MS code ME-MS61. Eldorado Gold (Quebec) QAQC procedure is Blanks every 20 samples and Standards alternating every 20 samples as well. Two Duplicate samples are taken at every 100 samples. All of this varies depending on the presence of visible gold with the Blanks and Standards placed before the sample containing the visible gold. Chain of custody for the majority of samples was handled entirely by Eldorado with respect to cutting, bagging and shipping samples to ALS Canada Ltd. and Bourlamaque Assay Laboratories. A portion of the samples were handled by the Groupe Axenix per diamond saw cutting, bagging and analytical shipment.

Eldorado Gold (Québec) Inc. Option Agreement:

The Company also announces that the Option Agreement made between Golden Valley Mines and Royalties Ltd. and Eldorado Gold (Québec) Inc. ("Eldorado") on October 8, 2021, and subsequently assigned to Val-d'Or Mining, has now expired in accordance with its terms. The Company further advises that Eldorado has opted to retain a 30% interest in the properties subject to the Option Agreement.

Qualified Person

Mr. Glenn J. Mullan, P.Geo., President and CEO of Val-D'Or Mining, is the Qualified Person (as that term is defined in National Instrument 43-101 – Standards of Disclosure for Mineral Projects) who has reviewed and approved this news release and is responsible for the technical information reported herein.

Eldorado Gold has not approved and is not responsible for the contents of this news release.

About Val-D'Or Mining Corporation
Val-D'Or Mining Corporation is a junior natural resource issuer involved in the process of acquiring and exploring its diverse mineral property assets, most of which are situated in the Abitibi Greenstone Belt of NE Ontario and NW Québec. To complement its current property interests, the Company regularly evaluates new opportunities for staking and/or acquisitions. Outside of its principal regional focus in the Abitibi Greenstone Belt, the Company holds several other properties in Northern Québec (Nunavik) covering different geological environments and commodities (Ni-Cu-PGE's).

The Company has expertise in the identification and generation of new projects, and in early-stage exploration. The mineral commodities of interest are broad, and range from gold, copper-zinc-silver, nickel-copper-PGE to industrial and energy minerals. After the initial value creation in the 100%-owned, or majority-owned properties, the Company seeks option/joint venture partners with technical expertise and financial capacity to conduct more advanced exploration projects.

For additional information, please contact:

Glenn J. Mullan
2772 chemin Sullivan
Val-d'Or, Québec J9P 0B9 Tel.: 819-824-2808, x 204
Email: glenn.mullan@groupzedzed.com

Forward Looking Statements:

This news release contains certain statements that may be deemed "forward-looking statements". Forward looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects", "plans", "anticipates", "believes", "intends", "estimates", "projects", "potential" and similar expressions, or that events or conditions "will", "would", "may", "could" or "should" occur. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or realities may differ materially from those in forward looking statements. Forward-looking statements are based on the beliefs, estimates and opinions of the Company's management on the date the statements are made. Except as required by law, the Company undertakes no obligation to update these forward-looking statements in the event that management's beliefs, estimates or opinions, or other factors, should change.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.